An automated transfer line is to be designed. Based on previous experience, the average downtime\nper occurrence = 5.0 min, and the probability of a st
An automated transfer line is to be designed. Based on previous experience, the average downtime
\r\nper occurrence = 5.0 min, and the probability of a station failure that leads to a downtime
\r\noccurrence p = 0.01. The total work content time = 9.8 min and is to be divided evenly amongst the
\r\nworkstations, so that the ideal cycle time for each station = 9.8/n. Determine (a) the optimum
\r\nnumber of stations on the line n that will maximize production rate, and (b) the production rate and
\r\nproportion uptime for your answer to part (a).