An automated transfer line has 20 stations and operates with an ideal cycle time of 1.50 min.\nProbability of a station failure = 0.008 and average dow
An automated transfer line has 20 stations and operates with an ideal cycle time of 1.50 min.
\r\nProbability of a station failure = 0.008 and average downtime when a breakdown occurs is 10.0
\r\nminutes. Determine (a) the average production rate and (b) the line efficiency.