A vertical boring mill is used to bore the inside diameter of a large batch of tube-shaped parts. The diameter = 28.0 in and the length of the bore =
A vertical boring mill is used to bore the inside diameter of a large batch of tube-shaped parts. The diameter = 28.0 in and the length of the bore = 14.0 in. Current cutting conditions are: speed = 200 ft/min, feed = 0.015 in/rev, and depth = 0.125 in. The parameters of the Taylor equation for the cutting tool in the operation are: n = 0.23 and C = 850 (ft/min). Tool change time = 3.0 min, and tooling cost = $3.50 per cutting edge. The time required to load and unload the parts = 12.0 min, and the cost of machine time on this boring mill = $42.00/hr. Management has decreed that the production rate must be increased by 25%. Is that possible? Assume that feed must remain unchanged in order to achieve the required surface finish. What is the current production rate and the maximum possible production rate for this job?
\r\n