A product whose total work content time = 50 minutes is to be assembled on a manual production
\r\nline. The required production rate is 30 units per hour. From previous experience with similar
\r\nproducts, it is estimated that the manning level will be close to 1.5. Assume that the uptime
\r\nproportion and line balancing efficiency are both = 1.0. If 9 seconds will be lost from the cycle time
\r\nfor repositioning, determine (a) the cycle time and (b) the numbers of workers and stations that will
\r\nbe needed on the line.